Workshop Goal:
Resolve issues in the way of production detector wafer layouts.
By the end of May update the detector wafer specifications and detector production fabrication plan in preparation for a Conceptual Design Review.
Join Zoom Meeting
https://lbnl.zoom.us/j/96875310096?pwd=WUNqdnUweTZ4ajR4SDIxeE1hdkxvUT09
Meeting ID: 968 7531 0096
Passcode: 79945509
One tap mobile
+13017158592,,96875310096#,,,,*79945509# US (Washington DC)
+13126266799,,96875310096#,,,,*79945509# US (Chicago)
Dial by your location
+1 301 715 8592 US (Washington DC)
+1 312 626 6799 US (Chicago)
+1 646 558 8656 US (New York)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 669 900 6833 US (San Jose)
Meeting ID: 968 7531 0096
Passcode: 79945509
Updates on R&D milestones
Milestone sheet
https://app.smartsheet.com/sheets/7Wr6RrQhWwQhVxGXMQVPXM5mcP8rq2PpMv6Q9891?view=grid
Status of work to evaluate the change in sensitivity
Status of work to evaluate the change in sensitivity from changing LAT UHF from Rhombus to Hex
Status and plans for evaluating the sensitivity: Description of parameters and optimization metrics, options for improving sensitivity
Update from Argonne, comments from other sites
Status and plans for evaluating the change in sensitivity
Summary of tests performed during detector fabrication at each site
Priorities for resolving remaining issues